Burnham Parish Council Offices – Case Study

External Painting to Burnham Parish Council Offices

External Decoration Burnham Park, Windsor Lane, Bucks.   Burnham being the home of the ancient woodland, Burnham Beeches.

Project Requirements

To clean and apply wood stain to give the building a refreshed look and adding further protection with as much longevity as possible.

Solution Implemented

We cleaned and emptied gutters of debris. Then cleaned the pre-finished soffits and fascias then our decorators prepared the existing timber cladding, beams, posts, rafters and columns and then applied a Sadolin woodstain to match the existing finish.

Challenges Overcome

To match the existing wood stain colour we tested a couple of colours first so the client could approve. We also had to work around the public on this project because as with many of these types of properties they need to remain open at all times.

Results

The building now stands out in its lovely central location in Burnham Village. On this page, you will find some imagery relating to works completed on the project. For further information about this or any other project carried out by the ABK team please contact us directly via the office. 

 

Useful Links

Take a look at our “before and after” gallery and our commercial gallery for a range of decoration works carried out.

Before and After Gallery and Case Studies https://www.abkltd.co.uk/before-and-after-gallery/
Commercial Gallery and Case Studies https://www.abkltd.co.uk/commercial-projects-gallery/

Internal Painting at The Royal Grammar School – Case Study

Internal Painting at The Royal Grammar School

Internal decoration at The Royal Grammar School, Amersham Road, High Wycombe, Bucks.

Project Requirements

To carry out internal painting and decorating to the ground floor and the science block foyer (3 areas).

Solution Implemented

Our decorators applied a sealer to exposed brickwork where necessary.  Emulsioned brick columns, ceilings and walls in ICI Dulux Diamond Matt, we applied a coloured wood varnish to previously varnished surfaces and ICI Dulux Metalshield to the metal surfaces.

Challenges Overcome

This work was to be started and completed within the school holiday break and could not run over, it was a last minute order but we completed it to our normal high standard and within time.

Results

A lovely refreshed foyer area completed with the new RGS colour scheme. On this page, you will find some imagery relating to works completed on the project. For further information about this or any other project carried out by the ABK team please contact us directly via the office. 

 

Useful Links

Take a look at our “before and after” gallery and our commercial gallery for a range of decoration works carried out.

Before and After Gallery and Case Studies https://www.abkltd.co.uk/before-and-after-gallery/
Commercial Gallery and Case Studies https://www.abkltd.co.uk/commercial-projects-gallery/

External Painting to The Pilot Pen Company – Case Study

External Painting to The Pilot Pen Company

External Decoration to a commercial building in Millboard, Bourne End, Buckinghamshire.

Project Requirements

To carry out external cladding painting to one side elevation to this commercial building in Bourne End.

Solution Implemented

Using our own scaffold towers, we prepared and applied ICI Dulux Metalshield Gloss paint in a colour of RAL 5005 to, roller shutter doors, frames and metal bollards.

Challenges Overcome

This was a small straightforward job for us, we knew the outcome would look amazing and now stands out on this industrial estate.

Results

This really refreshed the image of the building. On this page, you will find some imagery relating to works completed on the project. For further information about this or any other project carried out by the ABK team please contact us directly via the office. 

 

Useful Links

Take a look at our “before and after” gallery and our commercial gallery for a range of decoration works carried out.

Before and After Gallery and Case Studies https://www.abkltd.co.uk/before-and-after-gallery/
Commercial Gallery and Case Studies https://www.abkltd.co.uk/commercial-projects-gallery/

Internal Painting to Large Warehouse – Case Study

Internal Painting to Large Warehouse in Hayes.

Internal Decoration – walls and steelwork to a large warehouse unit in Hayes, Middlesex.

Project Requirements

Internal painting to internal blockwork, warehouse columns, metal capping to blockwork, steel bracing between columns, roof steels and steelwork around roller shutter doors.

Solution Implemented

We prepared all the areas in this large warehouse area and hired in specialist platform access to reach the high areas, all work.  We used a Johnstones Steel and Cladding paint for the steelwork and ICI Dulux Contract Matt for the blockwork and columns.

Challenges Overcome

We were given a 3-4 week turnaround for this project, we achieved it with our team of painters. So the client was extremely pleased with the quick turnaround.

Results

We were able to give the client a saving on this work due to a new paint product we used with a high coverage rate. On this page, you will find some imagery relating to works completed on the project. For further information about this or any other project carried out by the ABK team please contact us directly via the office. 

 

Useful Links

Take a look at our “before and after” gallery and our commercial gallery for a range of decoration works carried out.

Before and After Gallery and Case Studies https://www.abkltd.co.uk/before-and-after-gallery/
Commercial Gallery and Case Studies https://www.abkltd.co.uk/commercial-projects-gallery/

Wycombe High School Case Study

Wycombe High School Case Study

The ABK team was approached by Wycombe High School to carry out some external decoration works.

Project Requirements

We were awarded the contract to carry out the painting to four main buildings, including staircases, link bridges and front entrance gates.

Solution Implemented

We carried out a very high level of preparation work to ensure longevity and a high-quality finish.
Using existing scaffold and mobile elevated platform lifts for access we completed the high-level work first. We used high-quality paints throughout the contract tinted to the school’s colours.

During the project, we were asked to replace the guttering and downpipes on one of the buildings, our building division completed this using light grey materials consistent with the other school buildings. Please take a look at our building page for the building services that we provide.

Challenges Overcome

Working on School premises it is a necessity to have enhanced DBS disclosures.  All our decorators and management have up to date DBS.

Our painters were reliable, professional, very skilled and were backed up by the office staff and our Decorations Contract Manager who provided the specification for the work. We also provide a full range of trades for any building refurbishment work.

Results

The client was extremely happy with the finished project. The images above are our genuine pictures of the project.

Client Testimonial

“I am delighted with the external paint works to several buildings and railings. The advice given prior to works commencing regarding materials and methods used was helpful and informative, the administration was smooth and all legislative requirements met. ABK’s operatives on-site followed our school procedures and were a pleasure to have on-site.”

Diane Leahy, Facilities Manager