Park House, High Wycombe Case Study

Internal and External Decorations to Park House

Painting of new apartments converted from a Grade II Listed building opposite The Rye Park in High Wycombe.

Project Requirements

We painted all the apartments including hallways and staircases across the four floors, this was an extremely large project, working alongside the builders over an 8 month period as and when required.  We also painted the full exterior of the property.

Solution Implemented

A variety of paints were used including, Dulux Contract Matt and Durable Matt emulsions on walls and ceilings and Dulux Satinwood on the woodwork.  We used Dulux Ultimate Opaque and Smooth Masonry paint in Gardenia on the external. Dulux Metalshield in a satin finish was used on metal handrails, grilles and frames.

Challenges Overcome

If an internal area was not quite ready for us and the weather permitted, we were able to continue with the external painting.

Results

The builders did an amazing job with the conversion and we are pleased to be associated with the painting and decorating of it when looking across from The Rye Park the building really stands out and looks stunning.

On this page, you will find some imagery relating to works completed on the project. For further information about this or any other project carried out by the ABK team please contact us directly via the office. For more information on our building section for a full range of trades for any refurbishment work please take a look at https://www.abkltd.co.uk/more-than-painting/

Useful Links

Before and After Gallery and Case Studies https://www.abkltd.co.uk/before-and-after-gallery/
Residential Gallery and Case Studies https://www.abkltd.co.uk/residential-gallery/

Quick Contact

How can we help?